Overseas delivery time is best managed as a sequence of measurable milestones rather than a single promised date. Most delivery disputes come from confusing delivery lead time with vessel schedule. Clear definitions and milestone-based planning reduce uncertainty, improve execution, and align expectations across procurement, production, and logistics teams.
Executive Summary
Delivery lead time is the end-to-end timeline from order confirmation to cargo availability at destination or final delivery, depending on the agreed commercial terms.
Vessel schedule is the carrier’s planned sailing and arrival windows, governed by cutoffs and port operations.
For China Spring Festival 2026, ASKT expects impacted orders to reach factory delivery readiness in late March.
After ETD, ocean transit is typically around 45 days, with final timing driven by destination port, routing, and destination-side processing.
Core Definitions Used by ASKT

Delivery Lead Time
Delivery lead time is the total elapsed time from order confirmation to the point when the shipment is available under the agreed definition of delivery. It typically includes:
Order confirmation and documentation readiness
Production and quality release
Inland pickup and origin port handling
Booking and sailing window alignment
Ocean transit
Discharge, customs clearance, and local drayage
Final-mile delivery to the consignee or distribution center, when applicable
Vessel Schedule
Vessel schedule is the carrier’s published or confirmed plan for vessel movement and terminal cutoffs. It is usually communicated using:
Documentation and manifest cutoffs
Gate-in cutoff for containers entering the terminal
ETD, expected departure time from the origin port
ETA, expected arrival time at the destination port
Transit Time and Time to Available
Transit time refers to the vessel-movement portion, typically measured from ETD to ETA.
Time to available includes destination-side steps after ETA such as terminal availability, customs clearance, and inland movement.
What Determines Overseas Delivery Time

Production and Factory Release
Production is commonly the largest lead-time component and is influenced by:
Material readiness and upstream lead times
Line capacity and seasonality
Product complexity, testing, and inspection requirements
Packaging, labeling, and compliance documentation
Origin Handling and Port Operations
Even when goods are finished, origin-side constraints can add time:
Truck and chassis availability
Terminal appointment constraints
Cutoff timing compression during peak weeks
Container rollovers and short-shipment risk when vessels are overbooked
Booking and Carrier Network Behavior
Vessel schedule reliability varies with:
Space allocation and booking lead times
Blank sailings and schedule recovery
Port congestion, omissions, and changes to rotation
Ocean Routing and Destination Port Differences
The destination port matters because it changes:
Direct service versus transshipment probability
Dwell time at transshipment hubs
Terminal productivity and appointment systems
Inland connectivity, drayage capacity, and clearance patterns
ASKT Delivery Timing Adjustment for China Spring Festival 2026

Factory Delivery Timing
For orders affected by the Spring Festival production window:
Factory delivery readiness is expected to concentrate in late March.This reflects holiday shutdowns, workforce return cadence, and post-holiday capacity rebalancing.
Ocean Transit and Port Dependency
After factory delivery readiness and confirmed booking:
Ocean transit is typically around 45 days.
Final time-to-port depends on the destination discharge port and routing, especially where transshipment is required or where destination-side terminal and drayage capacity is constrained.
Customer Communication Standard for This Period
ASKT uses a two-part timing statement:
Factory delivery readiness in late March, based on production completion and quality release.
Ocean transit typically around 45 days from ETD, adjusted by destination port and routing conditions.
Service Milestones and What ASKT Controls
Milestones ASKT Directly Manages
Production schedule confirmation and line allocation
Quality release readiness and shipment documentation completeness
Coordination of pickup timing and origin handling readiness
Booking coordination and cutoffs alignment once cargo is factory-ready
Milestones Driven by External Parties
Carrier schedule changes, blank sailings, and terminal congestion
Customs inspection rates and clearance timelines
Destination terminal availability and inland drayage capacity
Severe weather or extraordinary events affecting port operations
Comparison Table: Normal Period Versus Spring Festival 2026 Impact Period
Stage | Typical Situation in a Normal Period | ASKT Spring Festival 2026 Impact Period |
Production scheduling | Stable throughput and predictable completion windows | Capacity shift due to shutdown and ramp-up; completion concentrates later |
Factory delivery readiness | Regular handover cadence | Late March concentration for impacted orders |
Booking and vessel allocation | More consistent space availability and cutoff behavior | Tighter cutoffs, higher competition for space, elevated rollover risk |
ETD reliability | Generally more stable | Higher deviation risk during post-holiday network recovery |
Ocean transit | Route-dependent variability | Typically around 45 days, with greater dispersion by discharge port and transshipment |
Destination availability | Driven by clearance and drayage | Higher variability if destination terminals and drayage are tight during peak flows |
Recommended Planning Method for Buyers
Use a Two-Part Delivery Commitment
Part 1: Factory delivery readiness window
Part 2: ETD-based ocean transit window to the named destination port
Define Delivery in Commercial Terms
Define delivery in the purchase order using one of the following, and keep it consistent:
Factory handover to forwarder
On-board vessel at origin port
Arrival at destination port
Delivered to door or delivered to distribution center
Confirm Destination Port Early
A specific discharge port enables realistic routing selection and reduces timing ambiguity.
Control Documentation Before Cutoffs
Documentation readiness is one of the highest-leverage drivers of schedule adherence, especially during peak weeks.
Operational Practices ASKT Uses During Peak Periods
Early Risk Flagging
ASKT flags timing risk when any of the following are present: late label approvals, compliance documentation gaps, or incomplete destination instructions.
Milestone-Based Updates
ASKT communicates using milestones once cargo is factory-ready: factory-ready confirmation, booking confirmation, ETD window, and ETA window.
Flexible Sailing Window Management
When carrier space is constrained, ASKT manages expectations using ETD windows rather than single-date promises, while prioritizing service patterns that reduce transshipment exposure where feasible.
FAQ

What is a typical delivery time for overseas orders
There is no single universal number. A reliable estimate separates production lead time, origin handling, sailing alignment, ocean transit, and destination availability steps. The combined timeline depends primarily on product complexity and the destination port.
Is vessel schedule the same as delivery time
No. Vessel schedule refers to the carrier’s planned sailing and arrival windows. Delivery time includes production plus all steps before sailing and after arrival.
When does the 45-day ocean transit clock start
A transit figure like 45 days is best measured from ETD to the destination port. Measuring from factory readiness will understate total time because it excludes origin handling and sailing alignment.
Why does the destination port change timing so much
Destination ports differ in routing options, transshipment likelihood, terminal productivity, clearance patterns, and inland capacity. These differences materially affect the time from ETA to cargo availability.
What should buyers expect around China Spring Festival 2026 for ASKT shipments
For impacted orders, ASKT expects factory delivery readiness to concentrate in late March. After ETD, ocean transit is typically around 45 days, but final timing depends on the destination port and routing, including whether transshipment is required.
How can buyers reduce risk during peak season
Define delivery precisely in the purchase order, confirm the destination port early, finalize documentation before cutoffs, and plan using realistic windows instead of single dates.
Quotation-Ready Summary
Overseas delivery time should be managed as a chain of milestones, not a single promise. Separate factory delivery readiness from vessel schedule performance and communicate both using ETD-based windows. For China Spring Festival 2026, ASKT expects impacted orders to reach factory delivery readiness in late March, followed by ocean transit typically around 45 days depending on the destination port and routing, with destination-side processing determining the final time to availability.